The Sankei Building Co., Ltd. (Location: Otemachi, Chiyoda-ku, Tokyo; President & CEO: Kazunobu Iijima) and Mitsubishi Corporation Urban Development, Inc. (Location: Chiyoda-ku, Tokyo; President & CEO: Masahito Tamura) announce the completion of the jointly developed facility S-GATE FIT Nihonbashi Bakurocho on April 20, 2023.
Carrying forward the "human-centric comfort and comfort" of the S-GATE series, S-GATE FIT introduces a wood-tone design imbued with the warmth of natural materials. It features a rooftop terrace that can achieve diverse work styles, along with equipment including a mechanical ventilation system that circulates the air in leased rooms twice an hour.
S-GATE FIT Nihonbashi Bakurocho is a located one minute on foot from Bakurocho Station on the JR Sobu Main Line and four minutes on foot from Bakuro-yokoyama Station on the Toei Shinjuku Line. The facility was born in an area where a wide range of companies are concentrated and offers convenient access from Tokyo Station. Further featuring daylighting on two sides and a full range of common areas including the rooftop terrace, the facility is steadily concluding tenant agreements.
Our company will continue to undertake office development aligned with working people.
・ Maximum area per floor of about 330m2, with one tenant per floor assumed
(The property allows partitioning into two sections)
・ Natural design that incorporates wood tones into the entrance interior decoration and office blinds
・ Digital signage at the entrance to deliver news, weather forecasts, and other information
・ Tenants-only, Wi-Fi-equipped rooftop terrace that meets diversified work styles
・ Mechanical ventilation system that circulates the air in leased room twice an hour (30m3 per person per hour)
・ Windows on opposing walls for natural ventilation
Name | S-GATE FIT Nihonbashi Bakurocho |
Location | 1-11-10 Nihonbashi Bakurocho, Chuo-ku, Tokyo |
Transportation |
・1 minute on foot from Bakurocho Station on the JR Sobu Main Line ・4 minutes on foot from Bakuro-yokoyama Station on the Toei Shinjuku Line |
Site area | 609.50㎡ |
Total floor area | 4,818.75㎡ |
Standard floor area | Floors 2-11: 373.97m2 |
Building uses | Offices, shops |
Structure and scale | Steel-frame structure, 11 above-ground stories |
Design and construction | Taisei Corporation |
Start of construction/Completion of construction | December 1, 2021/April 20, 2023 |